Mono Oxygen Villas
- Start from ฿22,990,000
- ฿95,800/sqm.
Description
Mono Oxygen Bangtao Villas are a luxurious and modern vacation villa located near Bangtao Beach in Phuket. With three spacious bedrooms and three modern bathrooms, it can accommodate up to six guests comfortably. The villa features glass block walls, creating a contemporary atmosphere and allowing natural light to illuminate the space. Guests can enjoy their private pool and relax on the sun loungers or indulge in the outdoor tub for ultimate relaxation. The fully equipped kitchen with high-end appliances makes meal preparation effortless. With its prime location, the villa is just a short walk away from the stunning Bangtao Beach, known for its pristine sands and clear waters.
Mono Oxygen Bangtao Beach is an exclusive community consisting of only six pool villas, ensuring privacy and exclusivity for its residents. Each villa features three bedrooms and a private pool, designed over two floors with meticulous attention to detail. Surrounded by lush greenery, the villas are situated on generously sized land plots, offering ample space and a seamless indoor-outdoor living experience. The interiors are elegantly designed with high-quality materials and finishes, providing a sophisticated ambiance. Residents can enjoy a range of exclusive amenities and services, including a private pool and easy access to the beautiful Bangtao Beach.
Mono Oxygen Bangtao offers a remarkable opportunity to experience luxury living in Phuket. With its limited number of villas, impeccable design, and desirable location, it presents a chance to indulge in the epitome of tropical bliss. Whether you seek a tranquil retreat or an exquisite lifestyle, Mono Oxygen Bangtao promises an unparalleled living experience in one of Thailand’s most sought-after destinations.
Surrounding area:
Tourists Attractions:
- Catch Beach Club is 1.2km away (approx. 4 mins. by car)
- Carpe Diem Beach Club is 2.1km away (approx. 5 mins. by car)
- Blue Tree Lagoon is 4.3km away (approx. 10 mins. by car)
Beach:
- Bangtao Beach is 1.2km away (approx. 4 mins. by car)
- Surin Beach is 3.8km away (approx. 8 mins. by car)
Grocery:
- Bangtao Night Market is 500m away (approx. 2 mins. by car)
- Lotus’s is 900m away (approx. 3 mins. by car)
- Villa Market – Boat Avenue is 2.7km away (approx. 6 mins. by car)
Bar & Restaurants:
- Wagyu Steakhouse is 3.1km away (approx. 7 mins. by car)
School:
- Headstart International School (Cherngtalay) is 6.4km away (approx. 15 mins. by car)
Address
- City: Thalang
- State/county: Phuket
- Area: Bangtao, Layan
- Country: Thailand
Details
- Price Start from ฿22,990,000
- Property Size 273.9 - 281.7 sqm.
- Land Area 240 - 302.2 sqm.
- Bedrooms 3
- Bathrooms 3
- Type Villa, Residential
- Property Status For Sale
Additional details
- 1st Reservation Deposit 2%
- 2nd Sign Contract within 15 days 23%
- 3rd Completion of Piling & Foundation 15%
- 4th Completion of Main Structure 15%
- 5th Completion of Roof, Walls and Patitions 15%
- 6th Completion of Floor Tiles and Wall Tiles 15%
- 7th Completion of Villa, Transfer Ownership 15%

















